The surface around Swanton & Enosburg is river alluvium and lake clay in the lowlands, till east toward the hills. Very flat, very wet, very productive ground in the lowland: good production when conditions allow and completely unworkable when they do not, with little in between. Long field approaches, generally wide. The constraint is bearing capacity, not width. Swanton reviews any excavation, filling or regrading on slopes of 15 percent or more, prohibits development on slopes over 25 percent, and protects a 50-foot buffer along every river and stream. Frozen ground is the working season on the lowland parcels; there is no dry-summer alternative on the wettest of them. Long, wide field approaches are rarely the constraint on this lowland; bearing capacity across river-clay ground is, so a dry-ground confirmation matters more than a width measurement.

Direct answer

How does the Missisquoi lowland affect clearing around Swanton and Enosburg?

Checked 2026-09-01

Ground conditions around Swanton & Enosburg
FactorOn the ground here
LandformMissisquoi River lowland and the farm country east of it
Elevation of workable groundroughly 100–700 ft
WatershedMissisquoi River to Missisquoi Bay
Mobilization zoneRegional: Franklin County
Public records for Swanton & Enosburg (Enosburgh · Enosburg Falls weather station)
MeasureValue
Frost-free windowMay 14 to October 1
Snowfall per year83.3 in
Named riversMissisquoi River and Trout River
Named lakes and pondsAdams Pond
Soils with bedrock within 40 in43%
Hydric (wetland-type) soil17%
Most extensive soilWoodstock-Rock outcrop complex (37%)
Seasonal high water table within 20 in44%

Swanton's slope review and riparian buffers

Swanton's land use and development regulations (July 2025) put steep slopes in section 3.12. Any excavation, filling or regrading on land with a slope of 15 percent or more is subject to Development Review Board site plan review, the board may require erosion control and stormwater plans prepared by a licensed engineer, and development is prohibited on slopes over 25 percent. On Swanton's Missisquoi lowland most ground sits well below those slope numbers, so the buffer lines in the next paragraph are the ones a farm-edge or brush job usually meets first.

Section 3.13 protects riparian buffers: all land within 50 feet of the top of bank of the main stem of any river or stream, within 10 feet of a drainage way, and within 250 feet of Lake Champlain's mean water elevation of 95.5 feet. The regulations require an undisturbed, naturally vegetated strip in those areas, and the board can widen it where rare species or significant natural communities are present. A clearing crew working a farm edge in Swanton should mark those lines before flagging the cut. Enosburg has its own bylaws, so this page's buffer widths are Swanton's.

Class II wetlands carry a 50-foot buffer zone

The Missisquoi lowland holds extensive mapped wetland, including some of the largest wetland complexes in Vermont, so the 50-foot buffer is a live question on parcels that are simply flat farmland to look at.

Likely project paths
01

Invasive Growth Removal

02

Brush Hogging & Field Reclamation

03

Pasture & Farm Reclamation

04

Hunting-Land & Habitat Access

05

Sugarbush & Orchard Access Clearing

06

Pond, Meadow & Field-Edge Reclamation